Metrolinx/TTC Follies - SmartTrack

Aug. 14, 2021
Aug. 14, 2021
Aug. 14, 2021
stevemunro.ca


Updated January 22, 2021: Replies from the City of Toronto to several questions seeking details of the proposed service and demand modelling have been added

Dec. 10, 2018

"The fix was in; #CityPlanTO 3-stop #SSE dropped in favour of #LawrenceKennedy and #FinchKennedy #SmartTrack stations"

Phil Prentice on Twitter - Dec 10'18
Dec. 10, 2018

John Tory pitched a 22-stop “London-style surface rail subway” during his 2014 mayoral campaign. The plan now is for a handful of stations added to existing GO lines that were already slated for increased, electrified service - CHRIS SO / TORONTO STAR FILE PHOTO