May. 26, 2017

3 Stop SSE vs SmartTrack

"The 3-stop extension of the Bloor-Danforth subway line would have provided a significant improvement in service for Scarborough - Two SmartTrack stops and the the 1-stop subway fail to do so - The only saving grace will be the extension of the Eglinton Crosstown LRT to UTSC - It will be a huge step backward if they fail to build the Crosstown East LRT"

Phil Prentice - May 26'17