Nov. 20, 2016

SmarterTracks - Scarborough - Phase IV - 5th DRAFT

This is the 5th draft of Phase IV of my SmarterTracks plan for rapid transit in Scarborough

This plan includes the following:

- A four-stop extension of the Bloor-Danforth (Line 2) Subway between Kennedy and Eglinton and McCowan and Sheppard [SSE]
- A subway connecting the Sheppard East (Line 4) Subway between Don Mills and Sheppard and the new SSE at McCowan and Sheppard
- A high-capacity parking facility at McCowan and Sheppard
- Preparation for an extension of the Bloor-Danforth (Line 2) Subway between McCowan and Sheppard and Markham ON
- A Markham Road LRT connecting Kennedy and Eglinton; Centennial College Progress Campus; and Malvern
- A driverless shuttlebus between Kennedy and Ellesmere GO Station; Scarborough Centre; and the Markham Road LRT at Markham and Progress and Centennial College Progress Campus
- An LRT between Ellesmere GO and UTSC connecting with Scarborough Town Centre, Scarborough Centre, and Rouge Valley/Centenary Hospital
- Preparation for a Finch East LRT between Yonge and Finch and Malvern Centre
- An Express LRT [the beginnings of an MBTD (Mississauga-Brampton-Toronto-Durham) Express LRT] along Lawrence Avenue East and Kingston Road between Lawrence GO and Highway #2 at Sheppard and Kingston Road
- A Sheppard East BRT between Scarborough Centre and Highway #2 at Sheppard and Kingston Road
- A driverless shuttlebus connecting the Toronto Zoo with the Sheppard East BRT