Quick Facts

Status: Planning and design
Number of stations: 5
Route length: 7.4 kilometres of additional subway route on eastern portion of Line 1 (Yonge Subway)
Major transit connections: GO Transit rail network (Richmond Hill line), GO Transit bus service, York Region Transit/vivaNext
Completion date: To be determined once planning and design work are complete

Overview

Metrolinx is working with the City of Toronto, the TTC, the Regional Municipality of York and the York Region Rapid Transit Corporation to continue planning, design and engineering work on the Yonge subway extension, which will connect more people to transit in the Greater Toronto and Hamilton Area.

 - Metrolinx -

Learn more about the Yonge subway extension

Oct. 12, 2016
Quick Facts

Status: Under construction (segments in use)
Number of new stops: 38
Route length: 34.6 kilometres
Major transit connections: Brampton Transit, GO Transit rail network (Barrie, Richmond Hill and Stouffville lines), GO Transit bus service, TTC Line 1 and Line 4, TTC bus service
Completion date: 2018

Overview

With over 34 kilometres of dedicated lanes for express bus service along Highway 7, Yonge Street and Davis Drive, this project will provide fast, reliable and comfortable service to residents of York Region. The first section of this project came into service August 2013; the last section will be in service in 2018.

 - Metrolinx -

Learn more about vivaNext Rapiways at vivanext.com

Oct. 12, 2016

Quick Facts

Status: Under construction

Number of stations: 1 bus terminal (6 subway stations are being built with funds provided by the Government of Canada, the Province of Ontario, the City of Toronto, and the Regional Municipality of York)

Route length: 8.6 kilometres of additional subway route on western portion of Line 1 (University Subway)

Major transit connections: Brampton Transit, York Region Transit/vivaNext, GO Transit bus services

Completion date: 2017

Overview

A portion of the extension will run through Toronto from the Downsview TTC subway station to Steeles Avenue, crossing into York Region and terminating at the Vaughan Metropolitan Centre. Metrolinx is working with the TTC to build a bus terminal that will be serviced by the GO Transit and York Region Transit at the Highway 407 TTC subway station. Once completed, the bus terminal will be owned by Metrolinx.