Toronto's Rapid Transit Lines (Subways, RTs, and LRTs)

Feb. 28, 2017

"Accordingly to your map; there are 25 stops from Runneymede to Warden Station, approximately 18.2 kms, a 256 minute walk at 71 metres/minute, with stops spaced at an average of 758 metres apart - This compares with the Eglinton Crosstown LRT which will be 25 stops from Mount Dennis to Kennedy Station, approximately 19 kms, a 267 minute walk at 71 metres/minute, with stops spaced at an average of 790 metres apart"

Phil Prentice
Feb. 22, 2017

See How the Future Subway Line Fits!

Here is a rendering of how the new Toronto-York Spadina Subway Extension will appear on the TTC system map when it opens at the end of 2017

ttc.ca

Nov. 13, 2016

Future Image of the System - 2021

Apr. 1, 2016

(See also Subpages)